Executive summary
Two of the most timing-dependent sectors in the UK economy rely on satellite signals that many organisations have not examined in detail as a risk.
The precise time delivered by Global Navigation Satellite Systems (GNSS), including GPS, underpins far more than navigation. It timestamps transactions, sequences records, synchronises networks and underwrites audit trails. It is infrastructure beneath infrastructure, and because it arrives free, continuously and invisibly, it is rarely treated as a dependency at all.
The International Centre for Critical Infrastructure Decision-Making commissioned an independent survey of 1,000 UK respondents working in financial services and in data centre, colocation and cloud infrastructure, fielded in July and August 2026 through an independent research panel. All findings in this report come from that survey.
Each chip is ten respondents. 71 of 1,000 were very confident. 929 were not.
7.1%
are very confident they could prove to a regulator or auditor that their timing held during a disruption
In summary: low awareness of GNSS's potential vulnerabilities, very little formal testing, limited confidence in detecting a jamming or spoofing event, little evidence of timing assurance that would satisfy a regulator, and no settled owner of the risk, with many organisations regarding it as an IT issue rather than a business risk.
The pattern is not that these organisations have weighed this risk and accepted it. It is that many have not given it the detailed attention it deserves.
“This is not a risk that has been assessed and accepted.”
Gary Daniel DoranChair, International Centre for Critical Infrastructure Decision-Making
Methodology
Read the methodologySample, screening, weighting and the two combined-option limitations.
The Centre commissioned a survey of 1,000 UK respondents, fielded between July and August 2026 by an independent research panel provider with no commercial relationship to the Centre. All respondents were screened on four criteria before answering: role, sector, function and organisation size.
Sample composition
Sector: 68.1% financial services (banking, trading, markets, insurance); 31.9% data centres, colocation and cloud infrastructure.
Role: 57.1% manager; 23.8% head of or senior manager; 15.0% director or VP; 4.1% owner or C-suite.
Function: 22.8% general management or executive; 20.1% IT, technology or infrastructure; 19.2% resilience or business continuity; 18.1% operations or service delivery; 8.0% engineering or operations; 7.0% security; 4.8% risk, compliance or audit.
Organisation size: 65.1% employ 1,000 or more.
Demographics: 12.0% aged 18–29, 55.0% aged 30–45, 28.0% aged 46–61, 5.0% aged 62–80. 79.0% men, 21.0% women.
Respondents were selected at random from within the screening criteria. Data is reported unweighted: no post-fieldwork weighting or quota correction has been applied, and the distributions shown are the raw response distributions on a base of 1,000.
All questions were single-choice and all distributions are reported on the full base of 1,000. For a proportion near 50% the indicative margin is ±3.1 percentage points at 95% confidence. This is a non-probability online panel, so that figure should be read as indicative rather than as true sampling error.
On one question, covering how long an organisation could continue operating after a timing failure, one of the five answer options combined a substantive response with a non-response. That option cannot be decomposed, so the full distribution for that question is not reported. The three unambiguous options are reported, and the remaining respondents are reported as a single combined figure that states both possible states rather than attributing them to either. The limitation is set out in the text where the question appears.
The full response distribution for every question is reproduced in the appendix to this report.
Independence
The questionnaire was designed by the authors and the fieldwork executed by an independent research panel provider rather than drawn from the Centre's own contacts. Fieldwork was funded by the International Centre for Critical Infrastructure Decision-Making. Readers should weigh both facts.
Funding
Fieldwork was funded by the International Centre for Critical Infrastructure Decision-Making.
Respondents
Respondents are managers and senior managers rather than board members. That is by design. These are the people who operate the systems, who would see the symptoms first, and who are best placed to say whether a test has actually been run rather than whether one was intended. Where this report describes what organisations do, it reports what the people closest to the systems say happens. Full sample composition, including the age and gender distribution, is set out above so that the evidence can be judged on what it is rather than on how it is described.
The dependency nobody examines
Ask an organisation what it depends on and you will get a list: power, connectivity, cloud, payments, people. GNSS timing does not appear on that list, and yet 34.9% of respondents say their organisation relies on it critically or heavily. For 14.2%, core operations would fail without it outright.
That reliance is not the problem. The problem is what sits alongside it. 43.3% were only vaguely aware, or not aware at all, that GNSS signals can be deliberately jammed or spoofed. Only 19.7% said their organisation actively considers it.
Base: 1,000 UK respondents
43.3%
were only vaguely aware, or entirely unaware, that GNSS signals can be deliberately jammed or spoofed
- Very aware: we actively consider it
- Fairly aware
- Vaguely aware
- Not aware at all
- Don't know
This is an unusual shape for a risk. Most critical dependencies are understood as risks precisely because their failure modes are familiar: power cuts, outages, breaches. GNSS timing has no such folk memory. It has never visibly failed at scale in the UK, so it registers as a utility rather than an exposure. The dependency has outrun the awareness of its primary failure mode.
Interference is not hypothetical, and it is not rare. The aviation monitoring group OPSGROUP, whose 2024 GPS Spoofing WorkGroup drew more than 950 participants from across the aviation industry, reported in September 2024 that an average of around 1,500 flights a day were being spoofed, against around 300 a day in the first half of the year. Interference is no longer confined to conflict zones: in July 2026 EASA updated its Safety Information Bulletin 2022-02 to Revision 4, and in January 2026 the coastal states of the Baltic Sea and the North Sea, with Iceland and including the United Kingdom, published an open letter to the international maritime community on the growing risks from GNSS interference.
~1,500
five-fold increase
Spoofed flights per day, average reported September 2024
from ~300 (Spoofed flights per day, first half of 2024)
OPSGROUP, GPS Spoofing: Final Report of the GPS Spoofing WorkGroup, 6 September 2024
The economic exposure has been quantified. London Economics, in research for the UK Space Agency published in 2023, estimated the benefit of GNSS to the UK economy at £13.62 billion a year, the impact of a seven-day loss at £7.64 billion, and the impact of a loss lasting just 24 hours at £1.42 billion.
£13.62bn
Annual benefit of GNSS to the UK economy
per year
£7.64bn
Estimated impact of a seven-day loss
single event, 7 days
£1.42bn
Estimated impact of a 24-hour loss
single event, 24 hours
London Economics for the UK Space Agency, The economic impact on the UK of a disruption to GNSS, 18 October 2023
A dependency worth £13.62 billion a year, with a single-day failure cost of £1.42 billion, is actively considered by fewer than one in five respondents.
A risk taken seriously, and left untested
29.9% say a 24-hour loss of accurate timing would be serious or catastrophic, with 8.2% choosing catastrophic outright.
A further 17.0% could not say what the impact would be at all. That figure deserves as much attention as the first. One in six people working in the UK's two most timing-dependent sectors cannot estimate what a day without accurate time would do to their organisation. Set against the £1.42 billion national figure for exactly that scenario, an unquantified dependency is not a small risk. It is an unmeasured one.
Now set both against the testing figures.
42.9% have never tested how their timing systems behave under interference. A further 18.1% say testing is planned but not done, which means 61.0% have no completed test behind them, with a further 9.2% unable to say. Only 8.2% test formally and regularly. In total, just 29.8% have carried out any form of test at all.
Base: 1,000 UK respondents
- Yes: formally and regularly
- Yes: once or informally
- No: but it is planned
- No: never
- Don't know
This is not a case of risk being weighed and accepted. Accepted risk looks different. It has a rationale, a compensating control and a review date. This looks like a risk recognised in the abstract and never converted into an action.
How long could they last?
Respondents were also asked how long their organisation could continue operating normally if GNSS timing became unavailable or unreliable.
10.2% said indefinitely, because they hold a time source independent of GNSS. A further 8.9% said several days, giving 19.1% with a buffer of days or more. 34.8% put it at about a day.
That accounts for 53.9% of respondents. The remaining 46.1% either could keep operating only a few hours, or could not say.
Base: 1,000 UK respondents
The fourth segment combines a substantive answer with a non-response. It is exactly accurate as stated and cannot be divided.
A note on this figure. One of the five answer options on this question combined "only a few hours" with "or don't know", and a separate "don't know" option was also offered. Those responses cannot be separated after the fact. The 46.1% above is therefore exactly accurate as stated, but it cannot be divided between the two states, and this report does not attempt to divide it. No claim is made here about how many organisations have only a few hours of buffer.
The figure carries weight without that division. Both states describe an organisation that has not established its own tolerance: one has a thin buffer, the other has an unmeasured one. Against a national estimate of £1.42 billion for a 24-hour national outage, close to half of the people closest to these systems cannot place their own organisation on the right side of that day.
Who owns this?
The clearest structural finding in the study is that the risk has no settled home.
Asked who owns the risk of a timing or positioning failure, 46.9% named IT or technology. Only 11.0% named risk and compliance and 8.9% a dedicated resilience function, meaning just 19.9% place the risk with a risk professional of any kind. Operations accounted for 17.1%. A further 16.1% could identify no owner at all: 3.0% said no one specifically owns it, with 13.1% unable to say.
One feature of the sample sharpens this.
Respondents are not defending their own territory. Only 20.1% of the sample works in IT, yet 46.9% named IT as the owner. Respondents are overwhelmingly assigning this risk to a function other than their own, which is the opposite of what self-interest would produce. This is not a survey of people passing the parcel. It is a survey of people describing where the parcel has landed.
The comparison with cyber security is instructive. Cyber risk was once distributed much like this: a technical concern, owned by whoever ran the systems, invisible to the board. It converged on the Chief Information Security Officer, and convergence is what made it governable, fundable and testable. Positioning, navigation and timing (PNT) resilience has converged on no one. Accountability falls between IT, risk and security, and a risk that falls between functions does not get tested, budgeted or reported.
Base: 1,000 UK respondents
Undetected going in, unevidenced coming out
Many respondents doubt they would know if interference reached them today.
50.1% are not very or not at all confident they would detect a jamming or spoofing event. Only 13.3% are very confident they would. A further 17.0% could not say either way.
Evidence after the event is weaker still. 40.2% are not confident they could prove to a regulator or auditor that their timing was accurate during a disruption. Only 7.1% are very confident they could.
Base: 1,000 UK respondents
Could you detect it?
Could you prove it afterwards?
- Very confident
- Fairly confident
- Not very confident
- Not at all confident
- Don't know
That last figure is the sharpest number in the study. Fewer than one in fourteen people working in the UK's most heavily regulated timing-dependent sectors is very confident their organisation could evidence its own time.
A note on this question. One of the five answer options combined "don't know" with "not applicable", and was selected by 21.9% of respondents. Those two states cannot be separated after the fact and this report does not attempt to separate them. The figures reported here are calculated on the full base of 1,000 and are exactly accurate as stated. Readers should note that "not applicable" is a defensible answer for organisations outside a timing-specific regulatory regime, as set out in the note at section 5.
These two findings compound in a way that neither does alone. An organisation that cannot detect an event and cannot evidence its timing afterwards is not merely exposed to disruption. It is exposed to disruption it will attribute to something else. Timing failures do not announce themselves. They surface as reconciliation breaks, sequencing anomalies, synchronisation errors and audit discrepancies, each of which has a dozen more familiar explanations. A cause that cannot be detected and cannot be evidenced will be recorded as something else entirely.
That is the practical meaning of running blind. Not that an attack would go unnoticed, but that its consequences would be misdiagnosed.
The compliance blind spot
49.0% understand their organisation's regulatory obligations on timing accuracy and operational resilience not very well, or not at all. Only 8.1% say those obligations are actively managed.
A note on this question. It was asked of both sectors in the study, and referenced MiFID II as an example of a timing-specific obligation. MiFID II applies to investment firms and trading venues, not to data centre operators, who fall under different regimes. The figure above therefore spans two populations with different obligations, and should be read as a measure of general regulatory confidence rather than of compliance with any single rule.
The obligations exist regardless, and they are more specific than many respondents may realise.
In the UK, trading venues and their members must synchronise business clocks to Coordinated Universal Time under the UK's retained version of Commission Delegated Regulation (EU) 2017/574, commonly cited as RTS 25. The requirement is tiered rather than uniform. Voice, request-for-quote and negotiated trading may diverge from UTC by up to one second; all other trading by up to one millisecond; high-frequency algorithmic trading and low-latency venues by no more than 100 microseconds, with timestamps granular to one microsecond or better. The EU's own version was replaced from 2 March 2026 by Delegated Regulation (EU) 2025/1155, so the UK and EU rules are now separate. Two consequences follow from the drafting. A free-running clock is non-compliant however stable it is, because the standard measures divergence from an external reference rather than internal stability. And where time is derived from GNSS, the offset between GNSS time and UTC must be documented and removed, not assumed to be zero.
The RTS 25 tiers
Commission Delegated Regulation (EU) 2017/574 (RTS 25), as retained in UK law, Article 50 and Annex Tables 1 and 2. legislation.gov.uk/eur/2017/574Link to this figure| Trading | Maximum divergence from UTC | Timestamp granularity |
|---|---|---|
| Voice, request-for-quote and negotiated trading | 1 second | 1 second or better |
| All other trading | 1 millisecond | 1 millisecond or better |
| High-frequency algorithmic trading and low-latency venues | 100 microseconds | 1 microsecond or better |
Four orders of magnitude between a voice desk and a co-located matching engine. The study spans two populations with different obligations: MiFID II applies to investment firms and trading venues, not to data centre operators, who fall under different regimes.
UK operational resilience rules require firms to identify their important business services, set impact tolerances, map the people, processes, technology, facilities and data that deliver them, and test that they can remain within tolerance under severe but plausible scenarios. These rules were made in FCA Policy Statement PS21/3 and PRA Supervisory Statement SS1/21, came into force in March 2022, and the transitional period ended on 31 March 2025. Full compliance is now expected, not pending.
DORA, Regulation (EU) 2022/2554, has applied since January 2025 and imposes ICT risk management, testing and third-party oversight obligations on EU financial entities. UK firms are in scope through their EU operations and through their role as service providers to EU entities.
Every one of those frameworks assumes timing that can be proven. Read alongside the 40.2% who are not confident they could prove their timing to a regulator, and the 7.1% who are very confident they could, the exposure is not that firms are knowingly failing a rule. It is that a substantial proportion do not yet know the rule attaches to a dependency they have never examined.
A firm that has mapped its important business services without mapping its timing dependency has an incomplete map. The rule has been in force since March 2025.
Testing is the missing step
There is demand for a way out of this.
43.9% describe an independent assessment of their timing and positioning resilience as valuable or extremely valuable, with a further 32.2% seeing at least some value in one.
Read against the rest of the study, that appetite is coherent rather than surprising. These are organisations that recognise the dependency, rate its failure as serious, and know they have not tested it. The willingness is not in doubt.
The missing step is regular testing against up-to-date scenarios, not a one-off exercise that gets filed away. An organisation that has tested what happens when timing degrades knows its own tolerance, can describe its exposure to a board, and can evidence its position to a regulator. An organisation that has not tested is relying on an assumption, however sound its architecture may be.
This is why 61.0% having no completed test is the operative finding in this report rather than a supporting one. Every other weakness the study describes – unowned risk, undetected events, unevidenced timing – persists because the dependency has never been tested under disruption and observed. Testing is not one option among several. It is the step that converts a dependency into a managed risk, and it is the step that has not been taken.
What this means at board level
The study describes a dependency that is widespread, largely unexamined, poorly owned, undetectable in the moment and unevidenced afterwards. Recognised as serious by three in ten of the people who operate it, tested by fewer than three in ten, and evidenced with confidence by fewer than one in fourteen.
Four questions are worth putting to any board.
1. Do we know where we depend on GNSS timing, and how long we would last without it? Not whether we use GPS, but where precise time enters our operations, what breaks without it, and what our actual tolerance is. Only 10.2% hold a time source independent of GNSS, and 46.1% either could keep operating only a few hours, or could not say.
2. Would we detect an interference event, and could we prove our timing held? Detection and evidence are separate capabilities. Only 7.1% are very confident of the second.
3. Who owns this risk? If the answer is "IT", that is the same answer 46.9% of respondents gave, and it is the finding this study exists to challenge. If your organisation has a resilience function, ask specifically whether timing sits inside it.
4. Should our important business services mapping include timing? Regular testing is a quick win here: it lets an organisation quantify its risk and measure its own improvement against it. The UK operational resilience transitional period ended on 31 March 2025. A map that omits a dependency this fundamental is not a complete map.
The organisations that come out of this well will not be the ones with the most sophisticated timing architecture. They will be the ones that asked the question at all.
Further resources
The Centre does not provide testing or assessment services. Organisations seeking to establish their own exposure should approach a specialist provider of PNT test and measurement capability.
GPS Spoofing: Final Report, published by the OPSGROUP International Ops workgroup.
Resilient PNT: Prepare, Act, Recover, best practice and guidance published by the Royal Institute of Navigation.
About the Centre
The International Centre for Critical Infrastructure Decision-Making is a not-for-profit research centre focusing on critical decisions in critical infrastructure. Based in the UK and international in focus, the Centre studies how decisions are made in critical infrastructure: who makes them, what shapes them, and how their effects travel. It researches, monitors and publishes, and contributes to policy. It does not sell, advise commercially or deliver services. It is chaired by Gary Daniel Doran.
Fieldwork was funded by the International Centre for Critical Infrastructure Decision-Making.
Sources and references
Survey data. All survey figures from a study of 1,000 UK respondents working in financial services and in data centre, colocation and cloud infrastructure, commissioned by the Centre and fielded July and August 2026 via an independent research panel. Full response distributions are reproduced in the appendix.
GNSS interference in aviation. OPSGROUP, GPS Spoofing: Final Report of the GPS Spoofing WorkGroup, published 6 September 2024. Reports 950 participants in the WorkGroup, and an average of around 1,500 spoofed flights per day, against around 300 per day in the first half of 2024. ops.group/blog/gps-spoofing-final-report/
GNSS interference: aviation safety. EASA, Safety Information Bulletin 2022-02, Revision 4, 3 July 2026.
GNSS interference: maritime. Joint open letter from the coastal states of the Baltic Sea and the North Sea, with Iceland and including the United Kingdom, to the international maritime community on the growing risks from GNSS interference, 26 January 2026.
Economic impact. London Economics, The economic impact on the UK of a disruption to GNSS, commissioned by the UK Space Agency, published via gov.uk, 18 October 2023. Estimates annual GNSS benefit to the UK economy at £13.62bn, seven-day loss at £7.64bn and 24-hour loss at £1.42bn. gov.uk/government/publications/report-the-economic-impact-on-the-uk-of-a-disruption-to-gnss
Clock synchronisation. Commission Delegated Regulation (EU) 2017/574 (RTS 25), as retained in UK law, Article 50 and Annex Tables 1 and 2. legislation.gov.uk/eur/2017/574
UK operational resilience. FCA Policy Statement PS21/3, Building operational resilience, and PRA Supervisory Statement SS1/21. In force 31 March 2022; transitional period ended 31 March 2025. fca.org.uk/publications/policy-statements/ps21-3-building-operational-resilience
Digital operational resilience. Regulation (EU) 2022/2554 (DORA), applicable from 17 January 2025.
Appendix: full response distributions
The full response distribution for every question in the study is published, reported as delivered, with each derived figure shown alongside its components.
What to do next
Check your own timing assurance
MAP, the ICCIDM Timing Assurance Framework, sets out what evidence of timing assurance looks like. Its self-check is anonymous, and nothing is saved unless you choose to add your result.
Hear about our research
To hear when new research follows Running Blind, email us and we will add you to our research list. This site does not collect your details.